SINGLE PHASE SERVICE
AVAILABILITY
This schedule is available to all single phase loads, for all uses subject to the established rules and regulations of the Cooperative. The capacity of individual motors served hereunder shall not exceed ten (10) horsepower. Motor starting currents shall not exceed 260 amperes.
CHARACTER OF SERVICE
Single phase, 60 hertz, at available secondary voltages.
MONTHLY RATE
Facility Fee |
@ |
$1.22/day |
|
|
|
|
|
First 200 kWh |
@ |
$0.1319 |
/kWh |
Excess kWh |
@ |
$0.1029 |
/kWh |
MINIMUM CHARGE
The minimum monthly charge shall be the Facility Fee.
Effective Date: All bills on and after May 1, 2024.
Facility Fee
The facility fee is a flat fee designed to recover a portion of the cost to deliver electricity to all members. This charge is reflective of the investment in poles, wires, transformers and equipment that it takes to provide members with electric service. It also supports line maintenance, right-of-way clearing and general administration. This charge allows everyone to pay a share of the basic costs in order to have reliable electric service available whenever it is needed.